Iconic Open University

Installation of Technical Infrastructure at the Take-Off Campus

Technical infrastructure testing and installation were done at the take-off campus of the university. It was a comprehensive and timeconsuming process. The process requires the expertise of both IT professionals and engineers to ensure that the systems are secure and functioning properly for the delivery of online courses at the university.

The process begins with a thorough analysis of the existing infrastructure, including assessing the hardware, software, and networking components. The next step is to develop a plan for testing and installing the new infrastructure. This includes setting up a test environment, testing the systems, and ensuring that all parts of the infrastructure work together properly.

Finally, the new systems can be installed and configured in the university environment.

1 thought on “Installation of Technical Infrastructure at the Take-Off Campus”

  1. Abdulrashid Wadata Buhari

    With this technical infrastructure and network, students will be able to study at their timeframe without network glitch, they will access their study materials and for the upload of assessments.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top